Work out what it really costs to start drilling — and what one well costs you to drill — using your own numbers. Every figure on this page is entered by you. Nothing here is a promise of income: it is arithmetic, printed in the open, so you can plan honestly.

Your numbers only

No hidden defaults and no industry “averages” slipped in. Blank fields count as zero — fill in every cost you actually face in your market.

Formulas in the open

Every formula used is printed on this page, below the calculator. Check the maths yourself before you trust a single output.

Estimates, not promises

Every output is labelled Estimate. This tool cannot predict dry holes, breakdowns, weather, or what customers in your area will pay.

The calculator

Fill in your own costs

Work through the three parts in order. Results update as you type. Amounts can be in any currency — outputs use the same currency you choose, with no conversion.

Part A — One-time startup costs

Not just the sticker price — use the price you have been quoted. Published Aurora FOB ranges are in the reference table below.

Sea freight, port handling, inland transport — everything until the rig stands in your yard.

Customs duty, VAT/GST and clearance fees in your country. Rates differ widely — check with your customs authority or clearing agent.

Driller registration, business registration, insurance deposits — the paperwork cost of starting legally.

Drill rods, bits, hammer, hand tools and a first stock of wear parts and filters.

Support vehicle deposit, yard/site setup, training, marketing — anything else you must pay before the first well.

Part B — Cost of drilling one well

Your typical completed depth. Used for cost per metre and per-metre pricing.

Diesel for the rig, compressor and generator — or grid electricity for an electric rig — for one average well.

Driller plus assistants, for the days one average well takes — including your own pay. Unpaid “owner labour” is the most common costing mistake.

Bit and hammer wear, drilling fluids, fuel for water cartage — the share of wear items one well consumes. Casing and pump go in the next field if you supply them.

Leave at zero if the customer buys these separately — but then do not count them in your price either.

Transport between sites, site preparation, water for drilling, per-well permit fees.

Repairs share, surveying share, disposal, anything else that scales with each well.

Part C — Your price and your pace

What a customer actually pays you for one average well — in your market, not a number from the internet.

A realistic working pace for one rig and crew — not a best-case month. Decimals are fine (e.g. 2.5).

Reference

Aurora rig prices — for your Part A figure

These are the published FOB price ranges (China main ports) shown on this site’s model pages. Your Part A rig price should be the figure on your actual quotation — and remember freight, duties and clearance go in their own fields, not inside the rig price.

ModelClassPublished FOB range (USD)
TerroCore ZY-25Portable core / exploration$28,000 – $38,000
TerroCore ZY-40Portable core / exploration$48,000 – $62,000
Aquilon 180TElectric crawler water well$78,000 – $92,000
GeoTherm G260Geothermal borehole$95,000 – $115,000
Aquilon 300EElectric water well$118,000 – $138,000
BlastMaster B80Blast hole$135,000 – $158,000
Aquilon 450CCombination water well$168,000 – $195,000
NaviDrill H18Horizontal directional$185,000 – $220,000

Ranges depend on configuration. See the model pages and global shipping for what FOB includes — and Lesson 3, Drilling methods & choosing a rig, before you match a model to your ground.

The maths

Formulas used — printed in full

No hidden adjustments. If your accountant uses different definitions, you can reproduce every output here on paper:

  • Total startup cost = rig price + freight & delivery + duties & taxes + licences & permits + initial tools & spares + other startup costs
  • Cost per well = fuel/power + crew wages + bits & consumables + casing/screen/pump (if supplied) + moving & site costs + other per-well costs
  • Cost per metre = cost per well ÷ average well depth
  • Revenue per well = price per well — or, if you charge per metre: price per metre × average well depth
  • Margin per well = revenue per well − cost per well
  • Margin per month = margin per well × target wells per month
  • Simple payback (months) = total startup cost ÷ margin per month
Read this before you decide

What this calculator cannot tell you

Dry holes and bad ground

Some boreholes fail or under-yield, however good the survey. Decide — in writing, before drilling — who carries that cost: a fixed “per successful well” price, a per-metre rate, or a shared-risk arrangement. This calculator assumes every well is completed and paid.

Downtime, tax and finance

Repairs, waiting on spares, rain, tax, loan interest and licence renewals all eat margin and are not in these formulas. Established drillers keep a repair reserve; new drillers should too.

What your market will pay

The only price that matters is the one customers near you actually pay. Ask local drillers, check tender results, and cost three real sites before you fix your price — Lesson 6 (in preparation) works through this in full.

Depth margin

Costing assumes your rig comfortably reaches your average depth. Rate a rig 30–50% deeper than your deepest planned well; ratings are set in favourable ground, and margin is what absorbs the harder jobs.

Questions

Calculator FAQ

Is this a prediction of what I will earn?

No. It is arithmetic on numbers you supplied. It shows what your own figures imply — nothing about whether customers will come, wells will succeed, or prices will hold. Aurora Rigs does not promise income to any driller, in this tool or anywhere else.

Why is there no “average” price or cost pre-filled?

Because averages from another country, currency and geology would mislead you. A 60 m well in Kenya and a 120 m well in Texas share almost no costs. Your local figures — even rough ones — beat anyone’s global average.

Should my price cover the rig purchase too?

Over time, yes: that is what the payback line tests. Margin per well is what repays the startup cost. If your payback estimate runs to many years, either the price, the pace, or the rig choice needs a second look — before you buy, not after.

Can I use this offline or share it?

The calculator runs entirely in your browser — no account, no sign-up, and your figures are never sent anywhere. Use the print button to save a copy of your results.

Keep learning — free

Lesson 6, “The money: costing & pricing a well”, builds on this calculator. Join the Academy list and get the lessons and the starter pack (Starter Guide PDF, rig acceptance checklist, drilling log template) as they launch.

Join the list on WhatsApp