Home › Academy › Lesson 4
Academy · Lesson 4

Building a well that lasts

Anyone can make a hole. Professionals deliver a well: cased, screened, sealed, developed and tested to a written standard. This lesson follows the construction sequence used by the RWSN Code of Practice for Cost Effective Boreholes.

A well is a small piece of civil engineering that a family may drink from for 30 years. The difference between a hole and a well is a sequence of steps that cheap drilling skips — and that clients, NGOs and government programmes increasingly check. Work to a published standard: this lesson follows the structure of the RWSN Code of Practice for Cost Effective Boreholes (Rural Water Supply Network), the reference used by rural water programmes worldwide.

The construction sequence

  • Casing. Line the hole with casing of the diameter your design calls for — it keeps the hole open and gives the pump a home. In unstable formations, temporary casing during drilling protects the hole until the permanent string is set.
  • Screen placement. The slotted screen section goes opposite the water-bearing zones your drilling log identified — not "somewhere near the bottom". Screen slot size matches the formation and the gravel pack.
  • Gravel pack. Clean, graded gravel around the screen filters formation sand before it reaches the pump. Poorly graded or skipped packs are why young wells pump sand and eat pumps.
  • Sanitary seal. Grout (cement or bentonite) seals the top of the annulus so surface water — and everything in it — cannot run down the outside of the casing into the aquifer. This single step protects the water quality of the whole well.
  • Development. Surging, jetting or air-lifting clears drilling mud and fine particles from around the screen until the water runs clear. Skipping development leaves the well producing at half its capacity.
  • Pumping test. A step-drawdown and constant-rate test measures what the well can sustainably give — the number the pump is sized from, and the number in your completion report.
  • Water quality testing. At minimum, bacteriological safety and the basics your local standard requires. A well that yields water nobody should drink is not a finished job.

The handover is part of the product

Finish with documents, not just water: the drilling log (depths, formations, water strikes), the construction record (casing, screen, pack, seal), the pumping test result and the water quality certificate, plus pump details and maintenance notes. NGOs and government programmes ask for this pack before final payment; private clients show it to neighbours. Your completion report is your licence file, your case study and your referral engine in one folder.

The academy's Well Acceptance Checklist (in preparation, free by email — join the list below) turns this lesson into a one-page check for drillers and well owners to sign off together. Wear parts, rods, bits and pumps for the work above are in parts & support.

Sources: RWSN: Code of Practice for Cost Effective Boreholes

Get the 8 lessons by email

The free email course is being prepared — one lesson every three days, plus the starter pack (guide PDF, well acceptance checklist, drilling log template). Message us and we will put you on the list for launch day.

Join the list on WhatsApp